Skyline Renewables Solar Project
Concho County, TX

Galloway I Solar Project

Galloway is the first solar farm that was constructed by Skyline Renewables in 2020. It is located in Concho County, TX and is near Paint Rock.

Location

Concho county is located on the Edwards Plateau where the annual temperature averaging from 57 to 70°F with summer reaching around 100°F. Making it the ideal location for solar projects.

Environment

Powers 11,000 homes and avoids 826,000 metric tons of carbon dioxide per year.

Technology

Galloway has the physical capacity of 250 megawatts AC and uses Sungrow inverters and single-axis tracking technology.

Commercial Operation Icon
Commercial Operation
2021
Physical Capacity Icon
Physical Capacity
250MW
Equipment Manufacturer Icon
Equipment Manufacturer
Trina & Jinko
Equipment Quantity Icon
Equipment Quantity
88 inverters
Interested in learning more about Galloway I Solar Project?
Reach Out Now

What do you want to know about Galloway I Solar Project?

Galloway I Solar Project by the Numbers

Homes light green
Approximately
11K
Homes
Powered
Co2 light green
Approximately
826K
Metric Tons of CO2 Avoided per year
Capacity icon light green lg
Approximately
250
megawatts of Operation Capacity

Our Projects